Calculate concrete volume for a slab or footing, in cubic yards and 80-pound bags.
Equivalent bags
Ready-mix vs bagged
Usage Tip
Past roughly half a cubic yard, ordering ready-mix is usually cheaper and easier than mixing dozens of bags by hand.
80-lb bags = cubic feet ÷ 0.6
The result gives cubic yards for ready-mix and the number of 80-pound bags.
How much concrete do I need?
Concrete is figured by volume. Find the volume of the pour in cubic feet, divide by 27 for cubic yards, then add a waste factor because nobody wants to come up a fraction of a yard short with a slab curing in the sun. This calculator handles slabs, footings, piers and tubes, columns, curbs, stairs and round pads, then converts the result into bags — and tells you whether a ready-mix truck makes more sense than lifting eighty bags by hand.
Concrete slab calculator guide
For a slab, multiply length by width by thickness. Keep the thickness in the same units: a 10 by 10 ft slab at 4 in is 10 x 10 x (4/12) = 33.3 cubic feet, about 1.23 cubic yards before waste. Add 5 to 10 percent for spillage, uneven subgrade and over-excavation.
Concrete bags per cubic yard
One cubic yard is 27 cubic feet. Each bag yields a fixed volume, so a yard takes a lot of bags — which is exactly why ready-mix exists.
| Bag size | Yield | Bags per cubic yard |
|---|---|---|
| 40 lb | 0.30 cu ft | 90 |
| 60 lb | 0.45 cu ft | 60 |
| 80 lb | 0.60 cu ft | 45 |
Concrete coverage chart
How far one cubic yard spreads depends on slab thickness:
| Thickness | Coverage per cubic yard |
|---|---|
| 4 in | 81 sq ft |
| 5 in | 65 sq ft |
| 6 in | 54 sq ft |
| 8 in | 40 sq ft |
Concrete thickness recommendations
| Project | Typical thickness |
|---|---|
| Sidewalk | 4 in |
| Patio | 4 in |
| Shed pad | 4 to 6 in |
| Garage floor | 5 to 6 in |
| Driveway | 6 in (4 in for light cars) |
| Hot tub pad | 6 in |
Bagged or ready-mix?
Bagged concrete wins for small jobs — footings, a few posts, a small pad — up to roughly one cubic yard. Past that, the bag count climbs fast (a yard is 45 of the 80 lb bags) and ready-mix is usually cheaper and far less work, though small loads under three or four yards often carry a short-load fee. The calculator flags the crossover and compares the cost both ways.
Frequently asked questions
How many 80 lb bags of concrete in a yard?
About 45, since each 80 lb bag yields roughly 0.6 cubic feet and a yard is 27 cubic feet.
How much concrete for a 10x10 slab?
At 4 in thick, about 1.23 cubic yards before waste, or roughly 56 of the 80 lb bags. Most people order ready-mix at that size.
How thick should a concrete slab be?
Four inches for sidewalks and patios, five to six for garage floors, and six for driveways and hot tub pads.
How much waste should I add?
Five to ten percent for most pours; more on rough or sloping subgrade. It is much worse to run short mid-pour than to have a little extra.
When should I order ready-mix instead of bags?
Once you pass about one cubic yard. Mixing 45-plus bags by hand is slow and inconsistent; a truck is faster and stronger, watch for short-load fees.
How much does a yard of concrete weigh?
About 3,600 to 4,000 lb. Plan access and subgrade support accordingly.
Gravel Calculator · Rebar Calculator · Paver Calculator · Deck Calculator
Coming soon: Footing Calculator · Asphalt Calculator
Estimates are for planning. Concrete volume varies with subgrade, over-dig, slab thickness tolerance and bag yield; add a waste margin, confirm bag yields and ready-mix minimums with your supplier, and follow local code for thickness, reinforcement and footings.
Worked example
A 10 ft × 12 ft slab that is 4 inches thick is 10 × 12 × (4 ÷ 12) = 40 cubic feet, or about 1.48 cubic yards. Adding a 10% waste allowance gives 1.63 cubic yards, which is roughly 74 of the 80-pound bags at 0.6 cubic feet per bag. At that size, ordering ready-mix is usually easier than mixing dozens of bags by hand.
Common mistakes
Entering the depth in inches where feet are expected makes the result 12 times too large, so check the units on every field. Skipping the waste allowance, or ignoring an uneven base, can leave you short in the middle of a pour. Ready-mix suppliers often round up to the next quarter or half yard and may charge extra for small loads, so ask about their minimum before choosing between bagged and ready-mix.
Related calculators
Use the Gravel Calculator for the base under a slab and the Square Footage Calculator to find the area of an irregular space.