Grooving (plunge) cycle time estimates how long a peck-plunge groove takes from groove depth, plunge feed rate, number of pecks, and dwell time per peck.
How it works
Deep or narrow grooves are often plunged in pecks rather than one continuous pass to break chips and clear them from a confined cut; each peck retracts slightly before continuing, and a short dwell at the bottom of each peck helps clean up the groove wall. Total cycle time is plunge time plus the added dwell time across all pecks.
FAQ
When should I peck instead of plunging in one pass? Peck when groove depth exceeds roughly 3 to 4 times the tool width, when chip evacuation is difficult, or when you’re seeing chatter or poor finish on a single continuous plunge.
Related Guides
CNC Calculators · Parting-Off Time Calculator · ID Boring Time Calculator
Why grooves are cut in pecks
A groove is cut by plunging a narrow tool straight into the part, and chips have little room to escape in a deep or narrow slot. Cutting the groove in several pecks with a short pause between each lets the chips break and clear instead of packing in and breaking the insert.
How the time adds up
The plunge time comes from the depth divided by the plunge feed rate, multiplied by the number of pecks. The dwell for each peck adds on top as its own line, and the total cycle time is the sum of the two. More pecks improve chip control but increase the time per groove.
Practical tips
Start with fewer pecks in shallow grooves in short-chipping materials and add pecks for deep grooves in gummy materials such as stainless steel or aluminum. Keep dwell short, since long pauses add cycle time without much benefit once the chips have broken. Check that the plunge feed suits the insert width, because narrow tools are far more fragile.
