Estimate the total cost of a DIY or remodel project. Enter materials, labor, any other costs, and a contingency to get a planning total.
Usage Tip
Get at least two or three quotes for both materials and labor. The contingency line is not padding — it is the money that keeps a surprise from stalling the project.
Labor = hours × rate
Total = (materials + labor + other) × (1 + contingency%)
Contingency covers tax, surprises, and small extras.
For several materials, total them separately and enter the sum, or run the calculator once per material.
This excludes permits and equipment rental unless you add them under other costs, and sales tax varies by location.
